StakeInsights Consulting studio · deep tech

The people desk

Where are we short-staffed, and where are we over-paying?

Headcount, cost, talent and pay on one reconciled record — built from your HR system's own employee master, with anything estimated clearly marked as estimated.

Live today running in client systems Prototype built and demonstrable Can be built designed, ready to scope
Fig. 1 — How the people desk works — sources are pulled in, experts' rules and deterministic code produce every figure, and only then does AI explain it.
Prototype

Annual manpower plan

How many people do we need to hire next year, and where?

  • Replacement hiring from each department's own attrition rate
  • Growth roles tied to the business plan, not to last year's budget
  • Rolls straight into the people-cost line of the P&L
Hiring plan FY28 by departmentDemo
Headcount today412
Attrition, trailing year13.5%
Hires needed7756 to replace · 21 new roles
Sales34
Plant ops21
Supply chain9
R&D7
Finance4
HR & admin2
To replace leaversNew roles
Prototype

Talent nine-box

Who are we most at risk of losing, and who needs a plan?

  • Performance from appraisals, potential from calibrated manager input
  • Click any box for the names, their pay position and tenure
  • Tracks movement between boxes from one cycle to the next
Nine-box 116 managers and aboveDemo
  • Stars — 9 people; 4 are paid below their band midpoint
  • Act — 4 people; 3 have been here two cycles running
  • Moved up — 7 managers since last year's cycle
Prototype

Pay equity scan

Who is paid outside their band, and what would it cost to fix?

  • Every employee plotted inside their grade's pay band
  • Flags people below minimum, above maximum and pay compression
  • Costs the correction before the increment cycle, not after
Grade M2 · annual CTC 13 people · ₹ lakhDemo
Below band minimum2 people₹1.7 L a year to bring to minimum
Pay compression+9%2025 hires' median above longer-tenured peers
Can be built

Flight-risk warning

Who is likely to resign in the next six months — and why?

  • Built from signals HR already holds: pay position, increments, manager changes, team exits
  • Every score shows its reasons; nothing is a black box
  • Visible to HR business partners only, never to line managers
Retention watchlist high performers onlyDemo
EmployeeRiskWhy
Priya Nair
Key account manager · West
78No increment in two cycles · manager changed in July
Rohit Sharma
Shift lead · Silvassa plant
71Three teammates left in six months
Neha Kulkarni
FP&A analyst
64Paid 11% below band midpoint · top rating
Vikram Rao
Regional sales manager · North
58Region missed target three months running

Names are fictional. Scores run 0–100.

Prototype

Org design

Where is the structure too flat, too deep, or too dependent on one person?

  • The org chart built live from reporting lines in the HR system
  • Flags spans of control outside your guideline
  • Shows single points of failure: roles with no named successor
Leadership structure span guideline: 4–8Demo
Managing Director5 direct reports
CFO6 reports
COO12 reports
Sales head9 reports
CHRO4 reports

COO manages 12 people directly, and 3 plant heads have no named successor. Sales head at 9 is just over the guideline.

Company secretary reports to the MD and is not shown.

Can be built

Offer builder

Can we make this offer without creating a problem for the people already here?

  • Places a proposed offer inside the band, next to current peers in the role
  • Checks internal parity and approval rules before it's sent
  • Records who approved an exception, and why
New offer · Regional sales manager grade M3Demo
Inside the band₹27.5 L against a ₹20–28 L bandPass
Internal parity₹3.1 L above the median of 5 current regional sales managersReview
ApprovalTop 10% of band — needs CHRO sign-offPending

Agents on this desk

People problems, raised before the resignation letter.

Can be built

Probation ending

Reminds the manager two weeks before a probation review is due.

→ Line manager
Can be built

Team attrition spike

Warns when a team loses more people in a quarter than its normal rate.

→ HR business partner
Can be built

Pay change outside band

Catches payroll changes that push anyone outside their grade band.

→ Compensation
Can be built

Appraisal overdue

Chases managers whose reviews are late in the cycle, with their list.

→ Line manager

Next desk

Boardroom Desk

Start with one decision

Pick the screen you wish you had on Monday.

We'll scope the smallest system that puts it in front of you — on your own data, not a demo.

Tell us the decision you're trying to make.

We'll tell you what it takes — and whether you need a custom build at all.